UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Sweden: svenska
Sweden: svenskaSweden: svenska
Romania: românesc
Romania: românescRomania: românesc
Poland: polski
Poland: polskiPoland: polski
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Italy: italiano
Italy: italianoItaly: italiano
France: français
France: françaisFrance: français
Spain: español
Spain: españolSpain: español
International: english
International: englishInternational: english
Denmark: dansk
Denmark: danskDenmark: dansk
Germany: deutsch
Germany: deutschGermany: deutsch
Czechia: český
Czechia: českýCzechia: český
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
Canada: english
Canada: englishCanada: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
UAE: english
UAE: englishUAE: english

Stremaform® – Controlled Crack-Induced Joints

Stremaform® for crack-induced joints creates a controlled crack, in a specific location, to prevent spontaneous cracking in concrete slabs.

The speedy Stremaform® system simplifies construction of day joints, deep slabs and expansion joints. The extent of its capabilities doesn’t end there. Stremaform® for crack-induced joints creates a controlled crack, in a specific location, to prevent spontaneous cracking in concrete slabs.

Slow, costly and labour-intensive construction methods are now a thing of the past. Special Stremaform® units, designed to prevent positive connections between concrete sections, create an induced crack at the desired location. The units can also include integrated water bars, cages, metal waterstops or shear force dowels.

Stremaform® Crack-Induced Joints - for walls and slabs:

  • as stop-end formwork for sequential pours
  • for continuous pours in monolithic concrete structures

Stremaform® enables the Contractor to pour a sequence of concrete pours, whilst incorporating crack-induced joints, ultimately reducing the construction period. As a permanent formwork, Stremaform® remains in situ – eliminating the need to strip the formwork.

Alleviating concrete stress?
Another problem solved by MAX FRANK.

We recommend
Contact Contact
+971 6 5578197

Max Frank Middle East FZE
M3-15, P. O. Box: 123601
Saif Zone, Sharjah
United Arab Emirates