In larger building projects, crane foundations are integrated directly into the floor slab and are the first areas to be concreted. This stage is extremely important for the construction, because the crane plays an instrumental role on the building site. Stremaform® concrete jointing formwork enables the working joints in the crane foundation to be created quickly, securely and with a force-locked connection. As standard, the Stremaform® working joint can also be prefabricated with integrated waterproofing materials and sealed against groundwater
Max Frank Middle East FZE
M3-15, P. O. Box: 123601
Saif Zone, Sharjah
United Arab Emirates