UAE: englishUAE: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Pecafil® – the clever solution for edge formwork on floor slabs

Pecafil® edge formwork, © www.maxfrank.com
Pecafil® edge formwork, © www.maxfrank.com

Pecafil® is a lightweight, versatile formwork material that can be installed quickly without the need for a crane. Prefabricated angles allow for easy formwork setup, saving time and costs.

Especially in the early construction phase there is often a lack of heavy equipment – Pecafil® stands out here as a lightweight, versatile universal forming material. The prefabricated L‑angles can be mounted quickly with small equipment immediately after placing the blinding layer – ideal also for confined site conditions.

Thanks to the simple handling and the light attachment with a hammer or a stud‑setting tool, the angles can be set efficiently onto the blinding layer. According to the external bracing, different slab thicknesses can be stripped without issues. Also internal and external corners at changes in height in the slab are easily achievable thanks to the material’s ease of cutting and bending. Faster to the completed slab – without crane, without waiting times.

When no crane is available on site, Pecafil® plays to its strengths: the lightweight, prefabricated formwork material can be positioned, adjusted and fixed quickly by hand – entirely without heavy machinery.

What counts for you in formwork technology: speed, flexibility or reusability?

Faster to the finished floor slab – without a crane, without delays

When no crane is available on site, Pecafil® shows its strengths: The lightweight, prefabricated formwork material can be quickly positioned, adjusted and fixed by hand – with no need for heavy equipment.

In our video we show step by step:

  • How Pecafil® is used as edge formwork for floor slabs
  • How easily the L angles can be installed using a hammer or powder-actuated tool
  • Why recesses and edges are no problem
Please accept external cookies to watch this video.

Infographic: Pecafil® Edge Formwork for groud slabs & R.C. bases

Pecafil® Edge formwork for ground slabs
Pecafil® Edge formwork for ground slabs

CUSTOMER SERVICE
+49 9427 189-320
customer.service@maxfrank.com

We recommend
Contact Contact
+971 6 5578197

Max Frank Middle East FZE
M3-15, P. O. Box: 123601
Saif Zone, Sharjah
United Arab Emirates

blub