UAE: englishUAE: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Construction joints in underwater areas

Brunsbüttel, Germany

With Stremaform® concrete pours in underwater areas can be formed precisely and safely. Prefabricated, self-supporting elements enable execution without the need for stripping and without any subsequent finishing.

How can a concrete section be formed precisely and safely under water without requiring extensive post-treatment of the construction joint?

With Stremaform®, the formwork is created using prefabricated, self-supporting stop-end elements. The L-shaped elements are fully positioned under water and, depending on requirements, can also be equipped with integrated sealing. The first concrete section, such as a base slab, is then cast directly.

After all concrete sections of the base slab have been completed, the area can be pumped dry and subsequent construction phases can begin immediately. The key advantages: fast and safe installation, with no need for stripping or roughening of the construction joint. The elements remain in the concrete as permanent (lost) formwork.

Your advantages at a glance:

  • Defined construction and day joints in compliance with standards
  • Reliable sealing, even in underwater conditions
  • No stripping, no disposal, no post-treatment required
  • Efficient construction process, particularly for infrastructure projects such as locks
Please accept external cookies to watch this video.

Type of building:

Water & waste water

Clients and Developers:

Wasserstraßen- und Schifffahrtsamt Nord-Ostsee-Kanal

Industry:

Infrastruktur/Wasserbau

Building contractor:

Arbeitsgemeinschaft aus Wayss & Freytag Ingenieurbau AG und BAM Civiel bv

Completion:

2026


Products used
Contact Contact
+971 6 5578197

Max Frank Middle East FZE
M3-15, P. O. Box: 123601
Saif Zone, Sharjah
United Arab Emirates

blub