





In December 2024, construction began on the exclusive hotel ‘The Genevieve’ in East End, right on the Caribbean coast. The project not only creates first-class holiday offerings, but also jobs for the local population.
The hotel will feature 13 two-bedroom suites and two three-bedroom suites, as well as a rooftop pool. It combines modern elegance with Caribbean flair and offers a luxurious retreat in the breathtaking surroundings of Grand Cayman. Completion is scheduled for the first quarter of 2026.
MAX FRANK supplied Pecafil® permanent formwork material for the foundation formwork. This product, which is manufactured in Germany, is an ideal solution for strip foundations, especially in soil types such as sand and gravel. Its light weight, ease of adjustment on site and the fact that the formwork can remain in the ground mean that enormous time savings can be achieved on the construction site.
Hotel
Morritt Properties, Morritt's Resort
2026




Max Frank Middle East FZE
M3-15, P. O. Box: 123601
Saif Zone, Sharjah
United Arab Emirates