UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Romania: românesc
Romania: românescRomania: românesc
Poland: polski
Poland: polskiPoland: polski
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Italy: italiano
Italy: italianoItaly: italiano
France: français
France: françaisFrance: français
Spain: español
Spain: españolSpain: español
International: english
International: englishInternational: english
Germany: deutsch
Germany: deutschGermany: deutsch
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
Canada: english
Canada: englishCanada: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
UAE: english
UAE: englishUAE: english

DKDenmark: danskseSweden: svenskahuHungary: magyar

Imperial Park Anaerobic Digestion Plant

Middlesbrough, United Kingdom

Pecavoid® cellular void former was selected as an effective solution to combat slag heave during the construction of a new Anaerobic Digestion (AD) Plant.

There were deposits of blast furnace slag on the Imperial Park site up to 4m deep which posed a risk of ground heave, so a void needed to be created underneath the piled slab tank bases to accommodate the upwards expansion. Slag has been known to expand by 10-20% of its volume, but in this case only 50mm of movement was expected.

Pecavoid® CL105 15/22 was installed beneath the 350mm thick piled slab to create the required 50mm clear void.

The Anaerobic Digestion Plant will produce enough green electricity for the entire plant, with leftover power being sold back to the grid. The company’s 100% recycled crushed glass can be used in anything from swimming pool filters to tarmac.

The plant will be able to treat various types of organic waste and is designed to give the operator high flexibility regarding the type of feedstock they want to digest. This will allow them to optimise its income and react to changing market conditions.

The generated electricity will be fed into the National Grid and the generated heat will be used to heat the digesters to 40° Celsius and to pasteurize the digestate so that is can be used on the land.

Type of building:

Biogas plant

Engineers/ Specialist Planners:

Moorehead Sutton & Laing 

Completion:

2016


Products used
Contact Contact
+971 6 5578197

Max Frank Middle East FZE
M3-15, P. O. Box: 123601
Saif Zone, Sharjah
United Arab Emirates

Use of cookies

In order to be able to optimally design the website and continue to improve it, we use cookies. By continuing to use the website, you agree to the use of cookies.  For more information, see the cookie notes.