UAE: englishUAE: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Emmerich – Oberhausen expansion line

Emmerich, Germany

Three-track extension of the line 2270, Emmerich – Oberhausen on the German-Dutch border: load activation with Egcovoid® void former

As part of the three-track expansion of the Emmerich – Oberhausen line, impact protection against the adjacent bridge pillars was required for a bridge underpass, both to the existing foundation and to the bridge pillars. A cavity between the existing pillars and the massive impact protection prevents the construction from being stressed in the event of a possible impact.

Impact protection on bridge pillars
Impact protection on bridge pillars

To horizontally decouple the new foundations, the Egcovoid® settlement plate was used between the upper edge of the existing foundations and the floor slab. The settlement plate was also installed to vertically decouple the existing bridge piers. The settlement plate creates a load-free separating layer. Load releases are necessary, especially when forces are unpredictable, in order to generate targeted load transfer.

After the concrete has hardened, the Egcovoid® void former is watered to create the cavity between the existing concrete and the impact protection. The new concrete structure of the impact protection is completely separated from the old existing structure by Egcovoid®.

Video Egcovoid®

Please accept external cookies to watch this video.

Type of building:

Bridge

Clients and Developers:

DB Netz AT, Duisburg

Engineers/ Specialist Planners:

Pirlet & Partner, Köln, www.pirlet.de

Building contractor:

EIFFAGE, ARGE Oberhausen-Emmerich BA1 

Completion:

2024


Products used
Contact Contact
+971 6 5578197

Max Frank Middle East FZE
M3-15, P. O. Box: 123601
Saif Zone, Sharjah
United Arab Emirates

blub