Australia: englishAustralia: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Central Wastewater Treatment Plant

St. Gangloff, Germany

Construction of a modern, centralised wastewater treatment plant to ensure that regional waste management and environmental standards are met in the long term.

The project was necessary to replace the ageing existing plant, improve the efficiency of wastewater treatment and ensure long-term compliance with statutory requirements for water protection. The treated effluent from the plant is discharged into the Fischbach under controlled conditions. Furthermore, the treated water serves secondary purposes: during the summer months, some of it is supplied to the agricultural sector and, where necessary, is available as an additional fire-fighting water reserve for the local fire brigade.

The structural work for a central wastewater treatment plant places extreme demands on the durability and watertightness of the reinforced concrete used. The concrete structures at the St. Gangloff treatment plant – in particular the aeration tank, the secondary clarifier and the underground inlet channels – are in constant contact with mechanically abrasive and chemically aggressive wastewater. To withstand these stresses in the long term without the need for refurbishment, the structural shell was constructed as a watertight concrete structure. To achieve the required concrete quality and absolute watertightness, two specialised system solutions based on modern concrete technology were used at St. Gangloff:
The water-draining formwork membrane Zemdrain® and the coated metal waterstop Fradiflex®.

The combined use of Zemdrain® for surface quality and Fradiflex® for joint construction ensures that the concrete structures at the St. Gangloff sewage treatment works will reach their planned service life without premature concrete damage. The structural shell thus forms a durable and completely watertight foundation for the mechanical systems and building envelope, which are currently under construction.

Type of building:

Water & waste water

Clients and Developers:

Engineers/ Specialist Planners:

Building contractor:

Completion:

04 / 2028


Products used
Contact Contact

Max Frank Pty Ltd
1/42 Balaclava Street
Woolloongabba QLD 4102
Australia

blub