Australia: englishAustralia: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english

Saale-Elster Viaduct

Halle (Saale), Germany

In the bridge structure, the Stabox® special rebar connection for high shear forces were able to guarantee the most demanding requirements for an "indented" working joint.

The Saale-Elster Viaduct is a railway overpass on the new Erfurt-Leipzig / Halle line and is located south of Halle. The prestressed concrete bridge was built between 2006 and 2013. Over six kilometres long and with a branch of more than two kilometres on the bridge construction, the valley bridge is the longest bridge structure in Germany.

The customer required a "rough" reverse bending connection for the high shear stress in the joint direction. This was achieved with the special "indented" Stabox® T connection.

Thanks to the stable trapezoidal sheet of the box, the Stabox® T rebend connection for very high shear stress in the joint area meets the maximum requirements for an "indented" working joint according to DIN EN 1992-1-1 with NA (D) - Type Test Report dated 09.08.2013.

This custom solution was also achieved in rapid time through the close cooperation between MAX FRANK Anwendungsstechnik and the building contractor.

Type of building:

Bridge

Building contractor:

ARGE aus den Firmen Hochtief, Adam Hörnig und Gerdum und Breuer

Completion:

2013

Products used
Contact Contact

Max Frank Pty Ltd
1/42 Balaclava Street
Woolloongabba QLD 4102
Australia

Use of cookies

In order to be able to optimally design the website and continue to improve it, we use cookies.
You can find more information about this and about your rights as a user in our privacy policy
Imprint