Australia: englishAustralia: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Niendorf District School

Hamburg, Germany

Void former Egcovoid® enables the construction of a new school building onto existing structures without load transfers.

Void former Egcovoid® enables the construction of a new school building onto existing structures without load transfers.

The school was fundamentally renovated and 29 new classrooms were built, along with new communal rooms and a school canteen. The project was funded by City of Hamburg which has provided around 18 million euros for this project.

The new school buildings were placed onto the existing cellar but the cellar had not been designed and built for the additional loads. Therefore, the new building has been placed upon additional foundations next to the cellar.

Egcovoid® void formers with hose system were placed inbetween the existing cellar ceiling and the foundation slab of the new building. When the foundation slab reached a sufficient compressive strength to bear itself freely above the cellar, our void formers were watered via the hose system. This created a load-free layer of approx. 3 cm, so that the new building can settle downwards without transferring loads on the existing cellar.

At this construction site, there was no space to protect the Egcovoid® slabs against damage during the construction phase with a blinding layer. The problem was solved with two layers of PE film, which were directly integrated and glued onto Egcovoid. In addition, more spacers have been installed than usual to prevent the spacers from pressing into the void formers.

Type of building:

Education facility

Clients and Developers:

Schulbau Hamburg

Completion:

2017


Products used
Contact Contact
Contact

Max Frank Pty Ltd
1/42 Balaclava Street
Woolloongabba QLD 4102
Australia

blub