Denmark: danskDenmark: dansk
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Underground Tunnel Line 1

Quito, Ecuador

MAX FRANK Spain supplied fibre concrete spacers for the production of precast concrete parts for the Quito subway tunnel. A total of 30 containers were supplied.

The following product properties were essential for the selection of the fibre concrete spacers:

  • High loads
  • Low water absorption
  • Reduced tolerances in the vibrating formwork

The Quito Metro is an underground rail mass transit system consisting of a single line in Quito, the capital of Ecuador.

The length of the underground tunnel of line 1 is 19 kilometres. Three tunnel milling machines worked in parallel on different tunnel openings. Seven different segment moulds were used for tunnel construction, a total of 42. The progress of the machine allowed a laying speed of one ring with seven segments per hour.

Type af bygning:

Jernbane station, Tunnel

Kunder og udviklere:

Stadtverwaltung Quito

Ingeniører / Specialplanlæggere:

Acciona Ingemey

Byggeentreprenør:

Færdiggørelse:

2017

Projekt link:


Brugte produkter
Contact Contact
Contact

+45 89 80 94 11

MAX FRANK ApS
Naverland 31
2600 Glostrup
Denmark

blub