Denmark: danskDenmark: dansk
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Das Goethe

München, Germany

In Munich-Ludwigsvorstadt, a real estate project comprising 74 apartments is currently under construction. The residential building is equipped with an underground car park, a supermarket and a pharmacy – all being constructed on the basement and ground floor.

The building, near Munich's main train station and Theresienwiese, has two different residential concepts: The "city life" concept offers spacious penthouse apartments in the street-side building, whilst the "loft life" concept is being developed in the rear building and apartments have been designed in the style of industrial loft apartments.

Pecafil® permanent formwork played a key role in the construction of the residential complex. A four-metre deep basement was constructed, by bored pile shoring, at the neighbouring building. Pecafil® served as a lost formwork between the bored pile shoring and the basement wall of the new building. A concrete saving was achieved through the use of Pecafil as sheet piling. Not only was a gap of several centimetres created, settlements were also decoupled between the two structures.

In addition to Pecafil®, various MAX FRANK products from formwork technologies, reinforcement systems and sealing solutions were used throughout the construction of the “Das Goethe” project.

Type af bygning:

Erhvervsbygning, Beboelsesejendom

Kunder og udviklere:

ZIMA Immobilienentwicklung GmbH, www.zima-wohnbau.de

Byggeentreprenør:

Pöttinger Bau, Ottobrunn, www.poettinger.com

Distributør:

Froschmeier GmbH & Co. KG, www.froschmeier.de

Færdiggørelse:

2020

Projekt link:


Brugte produkter
Contact Contact
Contact

+45 89 80 94 11

MAX FRANK ApS
Naverland 31
2600 Glostrup
Denmark

blub