Denmark: danskDenmark: dansk
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

MAX FRANK administration building

Leiblfing, Germany

Aspects of sustainability and durability were planning objectives from the start and were realised with Sorp 10®.

The construction task for the new administration building planned to rearrange the access situation and create new office space on the existing company premises. The administration building itself is divided into three floors. Adjacent to the existing office building, a new inner courtyard will be created. The interior area gives the employees and visitors a high quality of stay.
In order to ensure a maximum degree of flexibility, the new building was based on an axial dimension of 5.25 m. Cast-in-place concrete pillars form the basic skeleton for the structure. Both
cast-in-place concrete ceilings and precast elements are used for the ceilings between floors. The collaboration between a filigree concrete ceiling manufacturer and the manufacturer of the pipe
systems for concrete core activation, it was possible to implement a system close to the surface combined with the Sorp 10® acoustic sound absorber. This offers the benefits of a combination of
room acoustics and building temperature control. The capacity of the ceilings in the building is therefore used to store thermal energy for heating or cooling spaces.

The architecture in the administration building is characterised by contrasts between hard construction areas and homely materials. The bronze-coloured windows together with the
grey of the façade create a calm, pleasant effect. For the interior design, alongside white, plastered
walls, natural oak was used, which reflects the sleek and simple overall demeanour inside. Aspects of sustainability and durability were planning objectives from the start. In order to verify this approach and make it visible, the building was certified according to DGNB and LEED criteria.

Type af bygning:

Kontor bygning

Kunder og udviklere:

 Max Frank GmbH & Co.KG
www.maxfrank.com

Arkitekt:

 HIW Architekten mbH
www.hiw-architekten-gmbh.de

Færdiggørelse:

 2015

Projekt link:


Brugte produkter
Contact Contact
Contact

+45 89 80 94 11

MAX FRANK ApS
Naverland 31
2600 Glostrup
Denmark

blub