Spain: españolSpain: español
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Controlled Crack Joint Formwork Element - Wall

The secondary reinforcedcontrolled crack joint formwork element for the wall area serves for targeted crack formation along the crack introducer.
Crack formation as a result of weakening of the concrete cross-sections takes place due to the integrated separation layer at 1/3 of the component thickness/cross-section thickness.
The reinforcement overlap between the first and second concreting section is ensured by the installation of the formwork element between the lateral reinforcement layers.

Properties

  • Formwork element for concreting break
    Formwork element for concreting break
MAX FRANK recomienda
Contacto Contacto
Contacto
Contacto
Contacto

+34 91 826 51 00 - Ext. 212

Contacto
Contacto
Contacto
Contacto

MAX FRANK España
Calle Agustín de Foxá 40
28036 Madrid
ES Spain

blub