The secondary reinforcedconstruction joint formwork element for ceiling slabs serves for the formation of a rough surface and for ensuring a friction-locking connection from the first to the second concrete pour.
The reinforcement overlap between the first and second concreting section is ensured by the installation of the formwork element between the upper and lower reinforcement layer.