The secondary reinforced construction joint formwork element for wall areas creates a rough surface and ensures a forced-locked connection between the first and the second concreting section. The formwork element comprises a rubber water bar cage for watertight joints according to the dimension of the on-site rubber water bar. The reinforcement overlap between the first and second concreting section is ensured by the installation of the formwork element between the lateral reinforcement layers.
+34 91 826 51 00 - Ext. 212
MAX FRANK España
Calle Agustín de Foxá 40
28036 Madrid
ES Spain