The secondary reinforced construction joint formwork element with its
double-sided formwork element serves for the formation of an upstand for
the wall/slab.
For watertight joints the formwork element comprises a metal water stop according to your specifications.
Installation takes place on the upper reinforcement layer of the slab, between the starter bars of the wall.
+33 (0)5 63 03 48 98
Max Frank SAS
25 Impasse de Monaco
82000 Montauban
France