The secondary reinforced construction joint formwork element with its double-sided formwork element serves for the formation of an upstand for the wall/slab.
The formwork element comprises a rubber water bar cage for watertight joints according to the dimension of the on-site rubber water bar.
Installation takes place on the upper reinforcement layer of the slab, between the starter bars of the wall.
+33 (0)5 63 03 48 98
Max Frank SAS
25 Impasse de Monaco
82000 Montauban
France