France: françaisFrance: français
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Kingston Gas Works

Kingston Upon Thames, Surrey, United Kingdom

In October 2015 Berkeley Homes obtained planning permission to redevelop the former Kingston Gas Works site.

The scheme is a 9 storey building comprising of 47 one bedroom, 64 two bedroom and 2 three bedroom flats with an associated gymnasium, parking and landscaping works. Some of the residential developments will be shared ownership for key workers who live or work within the borough. The development will include a new vehicular access off Seven Kings Way to serve the residents' basement car park, as well as new public realm and landscaping.

As part of the approach over £2.2 million will be invested in the local community and this has been spent on items including education and healthcare in the borough, a new linear park, improved pedestrian and cycle paths, a new Village Hall and a new culinary training restaurant in conjunction with Kingston College.

Pecavoid® is an approved cellular void former designed to combat the effects of clay heave on foundations. Pecavoid® is used to reduce the uplift pressure caused by clay heave on concrete slabs, rafts and piled foundations. A variety of different grades was used within the project allowing further savings for the contractors.

Type d'ouvrage:

Bâtiment résidentiel

Entreprise de construction:

Achèvement:

2018

Lien projet:


Produits utilisés
Contact Contact
Contact

+33 (0)5 63 03 48 98

Max Frank SAS
25 Impasse de Monaco
82000 Montauban
France

blub