Rebend connections enable the force-locked connection of two concreting sections. Due to the reinforcement box, the formwork shell does not need to be pierced, which reduces time and material costs.
Due to the indented design of the construction joint in transverse direction, highest load bearing capacities e.g. for the connection of a wall-ceiling connection, are achieved.