International: englishInternational: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Sweden: svenska
Sweden: svenskaSweden: svenska
Romania: românesc
Romania: românescRomania: românesc
Poland: polski
Poland: polskiPoland: polski
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Italy: italiano
Italy: italianoItaly: italiano
France: français
France: françaisFrance: français
Spain: español
Spain: españolSpain: español
International: english
International: englishInternational: english
Denmark: dansk
Denmark: danskDenmark: dansk
Germany: deutsch
Germany: deutschGermany: deutsch
Czechia: český
Czechia: českýCzechia: český
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
Canada: english
Canada: englishCanada: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
UAE: english
UAE: englishUAE: english

Top quality when shuttering precast concrete elements

Fibre concrete edge formwork

As permanent formwork, the fibre concrete edge formwork creates a high-quality finish when prefabricating concrete elements in the precast plant. Thanks to the improved material composi-tion, the edge formwork from MAX FRANK achieves top quality with regard to the stability, elas-ticity and surface of the elements.

Stability and elasticity thanks to improved material

High-quality materials and optimised manufacturing methods make it possible to manufacture the fibre concrete edge formwork with high compressive strength and sufficient elasticity. Thanks to the elastic material properties the edge formwork can be aligned perfectly straight and mounted by one person with a three-point mounting without the risk of breakage. The use of the formwork in the precast plant is thus much simpler and more cost-effective than other formwork materials.

Formwork for every area of use

Depending on where the edge formwork is used, different product variants are available with and without drip formers. Thanks to its ideal profile form, the edge formwork with pre-mounted sealing strip is particularly suitable for both ceiling (with one sealing strip) and wall shuttering (with sealing strips on both sides). The fibre concrete edge formwork as a standard element with flat support is recommended for the shuttering of ceiling openings, stair exits and various recesses in the indoor area.

February 2019

Servicebox

Product Variants

  • Fibre concrete edge formwork standard element
  • Fibre concrete edge formwork with sealing strips pre-mounted on one or both sides

standard length: 2,0 m, 2,7 m
heights: 160 mm to 300 mm
optional: 45° mitre cut

We recommend
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

Use of cookies

In order to be able to optimally design the website and continue to improve it, we use cookies.
You can find more information about this and about your rights as a user in our privacy policy
Imprint