International: englishInternational: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Sweden: svenska
Sweden: svenskaSweden: svenska
Romania: românesc
Romania: românescRomania: românesc
Poland: polski
Poland: polskiPoland: polski
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Italy: italiano
Italy: italianoItaly: italiano
France: français
France: françaisFrance: français
Spain: español
Spain: españolSpain: español
International: english
International: englishInternational: english
Denmark: dansk
Denmark: danskDenmark: dansk
Germany: deutsch
Germany: deutschGermany: deutsch
Czechia: český
Czechia: českýCzechia: český
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
Canada: english
Canada: englishCanada: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
UAE: english
UAE: englishUAE: english

How to: Shear force transmission for load-bearing exposed precast concrete façades

How to: Shear force transmission for load-bearing exposed precast concrete façades

For optimum shear force transmission, load-bearing precast concrete sections can be connected to the internal structure using Egcobox® thermal breaks.

A reduction in thermal bridging is achieved by thermally isolating the façade components from the internal structure using the Egcobox® connecting elements. In addition, optimum shear force transmission can be secured with the statically effective Egcobox® isolating element. For a cost-effective solution, Egcobox® units can be manufactured to suit structural requirements of this type of application.

How to:

Shear force transmission for load-bearing exposed precast concrete façades
  • Development of the Egcobox® cantilever connectors as a bespoke solution for load and reinforcement layout.
  • Production of the Egcobox® units for the precast plant.
  • Assembly of the precast sections with corresponding preassembly of the Egcobox® units.
  • On-site placement of the slab formwork for the in-situ concrete floor.
  • To enable the façade panels to be installed after the frame has been cast, a recess can be created in the floor slab using Stremaform® shuttering to receive the Egcobox® reinforcement bars. Using the Stremaform® shuttering provides the characteristics of an 'indented joint' according to EC2.
  • Mounting of the façade sections – securing the position with Egcodubel shear force dowel at the bottom of the elements and with the Egcobox® units placed into the recesses in the slab - which are subsequently concreted.

MAX FRANK provides static proofs and verifiable documents for special, customer-specific solutions.


We recommend
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

Use of cookies

In order to be able to optimally design the website and continue to improve it, we use cookies.
You can find more information about this and about your rights as a user in our privacy policy
Imprint