Stremaform® Joint Formwork for Crane Foundations
In larger construction projects, crane foundations are typically integrated directly into the base slab and are among the first sections to be concreted. Their early completion is essential, as construction cannot progress without a crane.
With Stremaform® joint formwork, construction joints in crane foundations can be created quickly, safely, and with a monolithic bond. The systems provide a reliable separation while ensuring an optimal connection between successive concrete pours.
If required, the Stremaform® joint can also be sealed against pressing groundwater – thanks to various integrated sealing options available within the system.