International: englishInternational: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Pecafil® for prefabricated reinforcement cages

The MAX FRANK permanent formwork Pecafil® can be used for foundation formwork, where it also proves advantageous in combination with prefabricated reinforcement cages.

Prefabricated Reinforcement Cages with Pecafil® Formwork – Efficient and Safe Construction
Prefabricated reinforcement cages from the bending shop greatly simplify work on site. They ensure consistently high execution quality and accelerate the construction process.

Before delivery, the cages can be pre-lined on the sides with Pecafil® formwork material. This eliminates the need for steel frame formwork on site. In addition to saving rental costs for the formwork, installation effort is also significantly reduced.

When Pecafil® is used as formwork, the backfilling is carried out prior to concreting. This counteracts concrete pressure in a targeted manner and ensures safe concreting.

How to:

Pecafil® as foundation formwork for prefabricated reinforcement cages
  • Production of the steel cage.
  • Application of Pecafil® formwork with appropriate spacers on both sides, fixed with cable ties at specific points.
  • Transportation to the construction site (Pecafil® and spacers can also be applied at the construction site if preferred).
  • Position the foundation units according to site plans.
  • Cover missing formwork at corners and connecting pieces with pre-bent flat Pecafil® sections. Observe the overlap length of 10cm. Join the connections using wire rods.
  • Backfill and compact the excavation.
  • Concrete the foundations.
We recommend
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

blub