International: englishInternational: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Precise void creation in walls using Egcovoid® system

Void former Egcovoid®  wall, © www.maxfrank.com
Void former Egcovoid® wall, © www.maxfrank.com

The decoupling of an existing wall and a new wall can be achieved by creating a cavity using Egcovoid® settlement plates. Watch the installation video to see how easy it is to use.

With the Egcovoid® system, targeted load-free zones - expecially in vertical applications. As separating new construction walls from existing structures or between municipal wall structures — the system offers solutions that are difficult to achieve with conventional methods.

  • Defined cavities through simply water activation
  • Vertical decoupling of walls up to 6 meters high– statically effective and acoustically optimized
  • Load-bearing leveling layer - on uneven substrates e.g. in front of sheet pile walls or bored pile walls

The video clearly illustrates the systematic construction process:

Note: This method can also be used in applications without a Pecafil® separation layer.

Please accept external cookies to watch this video.
  1. PE-foil: sliding layer for separation 
  2. Egcovoid® void former
  3. Foil bag for vertical application
  4. Dismounting aid

Precise void creation in walls using Egcovoid ® system

With the Egcovoid® void former, targeted load-free zones and defined cavities can be created easily through simple water activation. Especially in vertical applications—such as separating new construction walls from existing structures or between municipal wall structures — the system offers solutions that are difficult to achieve with conventional methods.
On uneven substrates—such as in front of sheet pile walls or bored pile walls—Egcovoid® also serves as a load-bearing leveling layer. It enables an even distribution of load during concrete pressure, ensuring a smooth pouring process.
The included layflat tubing allows targeted activation: after the concrete wall has hardened, water is inserted, causing the void former to lose its load-bearing capacity and creating a defined cavity.

Customer Service

Tel: +49 9427 189-320
cstmrsrvcmxfrnkcm

August 2025

SerVICE
We recommend
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

blub