International: englishInternational: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Plan and decouple prefabricated landings correctly

Impact sound-insulated shear force dowels Egcopal precast construction, © www.maxfrank.com
Impact sound-insulated shear force dowels Egcopal precast construction, © www.maxfrank.com

Impact sound insulation in stairwells is extremely important for living comfort. Coordinating planning, product and installation is important for prefabricated landings.

Stair landings place high demands on load-bearing capacity, impact sound, and fire protection. Egcopal combines these requirements in one system. It reliably transfers loads while ensuring tested impact sound decoupling.

Egcopal impact sound insulated shear force dowel

The Egcopal product family comprises three variants, which are characterised by different load-bearing capacities, joint widths and acoustic performance.

Egcopal impact sound insulated shear force dowel
Egcopal impact sound insulated shear force dowel

The following video, taken directly from the construction site, shows the process:

  • On the construction site: Prepare wall openings for the platform
  • In the precast plant: Egcopal anchor bodies are concreted directly into the platform
  • Before lifting: Attach distance plates (FDPL) to prevent sound bridges
  • Inserting the platform: Lift into the designated position using a crane
  • Installing Egcopal: Insert the acoustic box with mandrel through the wall opening
  • Important: Create a load-bearing mortar bed under each acoustic box
  • Connecting stair flights: Use Egcoscal stair bearings for flight decoupling
Please accept external cookies to watch this video.

Customer Service

Tel: +49 9427 189-320
cstmrsrvcmxfrnkcm

January 2026

SERVICE BOX
We recommend
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

blub