The third phase of the Monheim Central District development includes four buildings with different purposes. Several MAX FRANK solutions are being used for the reinforced concrete construction.
The development of the Monheim Central District is continuing. A new mixed-use development with four buildings is being built on an area of around 10,000 square metres opposite the Monheim Gate and the Town Hall Centre. The project brings together living, working, shopping and dining in one location, helping to expand and improve the existing town centre. The different functions of the buildings create a range of requirements for planning and construction. To meet these needs, several MAX FRANK solutions are being used in the reinforced concrete works. They support the installation of construction interfaces, waterproof sealing, thermal insulation and the maintenance of the required concrete cover.
Formwork stop-end element for construction joints in reinforced concrete construction
Waterproof sealing for concrete elements exposed to water
Thermally insulated connection for cantilever reinforced concrete elements
For ensuring the required concrete cover
Different structural elements, connection areas and reinforcement arrangements require suitable solutions. The MAX FRANK products used support various tasks in reinforced concrete construction and are selected according to the specific installation requirements of each application.
Business premises
Stadt Monheim am Rhein & Totalübernehmer: Baumberger Einkaufszentrum GmbH
Heine Plan GmbH
Assmann Beraten + Planen
Aug. Prien, Niederlassung Köln
Baustoffe Geulen, Aachen