International: englishInternational: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english

MERGE - Technology Centre

Chemnitz, Germany

A new laboratory building is being built at the TU Chemnitz. The base plate required a targeted introduction of the building loads as well as high tightness against radon.

Under the project management of the Chemnitz branch of the state enterprise Sächsisches Immobilien- und Baumanagement (SIB),  the construction of a new laboratory for the Bundesexzellenzclusters "MERGE - Technologiefusion für multifunktionale Leichtbaustrukturen" of the Chemnitz University of Technology begins.

The design of the laboratory building includes a structure with three full storeys and a stepped attic as a technical storey. The supporting structure of the building is a massive in-situ concrete construction with masonry partition walls. The building will be constructed without a basement and founded on a flat floor slab.

The base plate must be tight against radon and must not transfer any forces into the existing ground in some areas (so-called load release).
With the sub-structure waterproofing system Zemseal® and Egcovoid® void former, MAX FRANK can offer both of these requirements.

Type of building:

Office building

Clients and Developers:

Staatsbetrieb Sächsisches Immobilien- und Baumanagement (SIB Niederlassung Chemnitz) 

Architect:

Sweco GmbH

Engineers/ Specialist Planners:

Krone Ingenieure GmbH

Building contractor:

Backer Bau GmbH
S&P Abdichtungs GmbH

Distributor:

Thomas Schlafge Schalungsbedarf GmbH 

Completion:

2020

Project link:


Products used
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

Use of cookies

In order to be able to optimally design the website and continue to improve it, we use cookies.
You can find more information about this and about your rights as a user in our privacy policy
Imprint