International: englishInternational: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Sweden: svenska
Sweden: svenskaSweden: svenska
Romania: românesc
Romania: românescRomania: românesc
Poland: polski
Poland: polskiPoland: polski
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Italy: italiano
Italy: italianoItaly: italianodeutsch
France: français
France: françaisFrance: français
Spain: español
Spain: españolSpain: español
International: english
International: englishInternational: english
Denmark: dansk
Denmark: danskDenmark: dansk
Germany: deutsch
Germany: deutschGermany: deutsch
Czechia: český
Czechia: českýCzechia: český
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
Canada: english
Canada: englishCanada: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
UAE: english
UAE: englishUAE: english

Mine water cleaning plant

Profen, Germany

The mine water cleaning plant was the realisation of an environmental protection project for clean water. MAX FRANK supplied sealing technology products.

A modern treatment plant is being built on an area of around 1.2 hectares at the Profen open pit. The total capacity of the four treatment lines is approx. 10,000 cubic meters of water. The plant measures 85 by 85 meters and with the company building is around eleven meters high. Up to 120 cubic meters of water per minute can be treated at Profen. The result is clear, clean water.

After treatment, the water is passed through a ditch system into the White Elster. Part of the water will be used to stabilize the water supply and to flood and re-cultivate the Schwerzauer See.
A redundant joint seal according to the multi-barrier principle for concrete working joints was favoured for the project. This was to involve the design of several independent systems. All MAX FRANK sealing technology products are fully inter-compatible. The specialist planner decided to use the Fradiflex® polymer-coated metal water stop as the primary sealing and finished the seal with a Cresco® expanding waterstop.

Type of building:

Treatment plant

Clients and Developers:

MIBRAG mbH, Zeitz

Building contractor:

Hochtief Infrastructure GmbH, Berlin

Completion:

2017

Products used
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

Use of cookies

In order to be able to optimally design the website and continue to improve it, we use cookies.
You can find more information about this and about your rights as a user in our privacy policy
Imprint