International: englishInternational: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Innovative Construction Solutions for the RS76 Office Complex

Munich, Germany

For the RS76 office complex in Munich, we supplied MAX FRANK products such as Stremaform® formwork elements, Fradiflex® joint sealing systems, reinforcement connections and bespoke solutions.

At Richard Strauss Strasse 76 in Munich Bogenhausen, the Bayerische Versorgungskammer is realising a forward looking large scale project with the RS76 office complex. The modern building ensemble, offering a floor area of around 72,000 m², will serve as the new company headquarters under the name “House of the Future”. Two of the three building sections are being constructed using a sustainable timber hybrid method – combining contemporary architecture with the highest ecological standards. The building was already awarded the DGNB precertification in Gold during the planning phase.

This demanding construction project incorporated a wide range of high quality solutions from MAX FRANK, which we delivered over various construction phases. These included, among others, Stremaform® formwork elements for base slabs and walls with integrated waterstop – ensuring precise construction joints and reliable separation of concrete pours. For the slab constructions, formwork elements without sealing were used. We also supplied custom made Stremaform® recesses as well as special constructions tailored precisely to the project’s requirements.

The complete joint sealing was achieved using the Fradiflex® system, which offers long term protection against moisture and thus contributes to the durability of the structure. In addition, we supplied all reinforcement connections as well as part of the spacers and wall thicknesses, which are crucial for stability and construction reliability. A particular technical highlight was the specially developed Stremaboard solution for this project, designed for the interlocking of corbel beams.

Thanks to our broad product portfolio and close coordination with all project stakeholders, we were able to make a significant contribution to the smooth implementation and high construction quality of this flagship project.

The illustration below shows the Stremaform® system construction in detail:

Stremaform® infographic
Stremaform® infographic

Type of building:

Office building

Clients and Developers:

Architect:

David Chipperfield Architects
https://davidchipperfield.com/

KSP Engel GmbH
https://www.ksp-engel.com/

Engineers/ Specialist Planners:

Brendebach Ingenieure
https://www.brendebach.de/


Products used
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

blub