International: englishInternational: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Saale-Elster Viaduct

Halle (Saale), Germany

In the bridge structure, the Stabox® special rebar connection for high shear forces were able to guarantee the most demanding requirements for an "indented" working joint.

The Saale-Elster Viaduct is a railway overpass on the new Erfurt-Leipzig / Halle line and is located south of Halle. The prestressed concrete bridge was built between 2006 and 2013. Over six kilometres long and with a branch of more than two kilometres on the bridge construction, the valley bridge is the longest bridge structure in Germany.

The customer required a "rough" reverse bending connection for the high shear stress in the joint direction. This was achieved with the special "indented" Stabox® T connection.

Thanks to the stable trapezoidal sheet of the box, the Stabox® T rebend connection for very high shear stress in the joint area meets the maximum requirements for an "indented" working joint according to DIN EN 1992-1-1 with NA (D) - Type Test Report dated 09.08.2013.

This custom solution was also achieved in rapid time through the close cooperation between MAX FRANK Anwendungsstechnik and the building contractor.

Type of building:

Bridge

Building contractor:

ARGE aus den Firmen Hochtief, Adam Hörnig und Gerdum und Breuer

Completion:

2013