Sepulchral chapel with family crypt

München , Germany

An exposed concrete ribbed slab was produced with Fratec® forming formwork for a sepulchral chapel in the Waldfriedhof cemetery in Munich.

A sepulchral chapel with a family crypt was erected in the Waldfriedhof Munich at the end of 2015. In this construction project, an exposed concrete ribbed slab was produced using Fratec® creative formwork from MAX FRANK. The formwork area was approx. 100 sqm.
It was possible to make an exposed concrete ribbed slab because the Fratec® special formwork allows a uniform concrete surface which satisfies particularly exacting design requirements. Fine details can also be realized with this forming formwork.

Added benefits of Fratec® forming formwork:

  • Delivery of ready-assembled elements to the building site
  • Light in weight – no need for the use of a crane for moulding and de-moulding work
  • Use of release agents is not required

Type of building:

Cultural building

Engineers/ Specialist Planners:

Ingenieurbüro Förster + Sennewald, München
www.fsmuc.com

Building contractor:

Baugesellschaft Gebr. Rank GmbH & Co. KG, München
www.rank-bau.de

Distributor:

Froschmeier GmbH & Co. KG, Unterschleißheim
www.froschmeier.de

Completion:

2015

Products used
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

Use of cookies

In order to be able to optimally design the website and continue to improve it, we use cookies. By continuing to use the website, you agree to the use of cookies.  For more information, see the cookie notes.