International: englishInternational: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Laakso Joint Hospital

Helsinki, Finland

The ‘Laakso Joint Hospital’ project is one of the largest hospital projects in Finland. Stremaform® has been installed to form the concrete sections in the civil engineering works and Fradiflex® Premium to seal the joints.

The Laakso Joint Hospital is a building complex comprising both newly constructed and existing buildings. The existing buildings are being renovated and remodelled. In addition to the realisation of the hospital, extensive civil engineering work and tunnel boring will also be carried out. This includes technical facilities for the hospital, a multi-storey car park with 550 parking spaces and a logistics tunnel that connects various areas of the hospital complex underground.

Illustration: tunnel system under hospital
Illustration: tunnel system under hospital

The Stremaform® formwork was supplied for the civil engineering work by the Helsinki-based dealer Sulin. The ready-to-install concrete jointing formwork is one of the most efficient solutions for shuttering construction joints in concrete elements. Stremaform® is the faster and more economical solution compared to wooden formwork.

In the tunnel area, Fradiflex® Premium metal water stop was also used to create a watertight barrier between the floor slab and the rising walls, protecting against pressing water, ground moisture and seepage water. MAX FRANK fibre concrete spacers and the Zemseal® sub-structure waterproofing system were also used.

Video of the Laakso Joint Hospital construction site:

Please accept external cookies to watch this video.

Many thanks for the photo and video material toSulin, Helsinki.


Type of building:

Tunnel, Hospital

Clients and Developers:

Stadt Helsinki und HUS www.hus.fi

Engineers/ Specialist Planners:

Laakson LATU

Distributor:

Sulin, Helsinki https://sulinoy.fi

Completion:

2030

Project link:


Products used
Contact Contact
Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

blub