International: englishInternational: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

SAB - Sächsische AufbauBank

Leipzig, Germany

Due to the high groundwater contamination, a sealing concept with FBV system was planned as an additional measure.

SAB Förderbank and its 500 employees move from Dresden to a five-storey office complex in Leipzig. The one hectare building plot on the inner city ring road is heavily polluted with groundwater, so the requirements for the waterproof structure of the building were high.

The risk-benefit analysis justified supplementing the waterproof structure with sub-structure waterproofing system Zemseal®. Metal water stop, formwork elements, injection hose system were supplied as further components for a complete watertight system from MAX FRANK (single-sourced).

Type of building:

Office building

Clients and Developers:

Sächsische Aufbaubank – Förderbank
www.sab.sachsen.de
 

Engineers/ Specialist Planners:

ACME, Architekturbüro

Building contractor:

Züblin AG, Dresden
S&P Abdichtung Beucha
 

Distributor:

Thomas Schlafge Schalungsbedarf GmbH 

Completion:

2019

Project link:


Products used
Contact Contact
Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

blub