University Hospital of North Staffordshire

Stoke-on-Trent, Staffordshire, United Kingdom

MAX FRANK supplied Shearail® punching shear reinforcement system, which was adapted for use in semi-automated pre-cast production processes.

Shearail® is a prefabricated system alternative to individual shear links and is supplied in the form of rails carrying double-headed studs of variable diameter, length and spacing in accordance with BS8110. The most common application is on reinforced concrete flat slabs, but it is also employed in piled slabs, post-tensioned slabs, shear walls and other shear applications.

MAX FRFANK's technical design team re-engineered its Shearail® punching shear reinforcement system for use within the context of the manufacturing process, without compromising its structural integrity. MAX FRANK's design engineers adapted the existing Shearail® design to allow for quick, semi-automated assembly while keeping the stud heads in the compression zone.

Type of building:

Hospital

Building contractor:

Laing O'Rourke / Expanded Structures 

Completion:

2012


Products used
Contact Contact

+49(0) 9427 189-0

Max Frank GmbH & Co. KG
Mitterweg 1
94339 Leiblfing
Germany

Use of cookies

In order to be able to optimally design the website and continue to improve it, we use cookies. By continuing to use the website, you agree to the use of cookies.  For more information, see the cookie notes.