With the Egcovoid® former, you can reach a planned load-handling after the concreting.
To protect subterranean concrete structures against unintended loads, a flatly load-free layer must be created. This prevents unintended load, by deflections due to dynamic traffic loads (heavy vehicles, trucks, etc.). With the Egcovoid® former, you can reach a planned load-handling after the concreting.
How to:
September 2017
+31 162 241 051
Max Frank Nederland B.V.
Ramgatseweg 9a
4941 VN Raamsdonksveer
Nederland