Netherlands: nederlandsNetherlands: nederlands
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

5 Broadgate

London, United Kingdom

Gesitueerd in de City van Londen en gebouwd rond en op Station Liverpoolstreet, heeft MAX FRANK materialen geleverd aan het '5 Broadgate' kantoor gebouw.

Situated in the City of London's Square Mile and built around and above Liverpool Street Station, Max Frank Ltd. supplied Shearail® punching shear reinforcement to the new '5 Broadgate' office estate.

The new 12-storey 'groundscraper' will be built on the site that was previously occupied by 4 & 6 Broadgate and will provide over 700,000 sq ft (66,890 sq m) of new space for clients & staff of UBS. The entire site comprises over 4 million sq ft of office, retail and leisure space where over 30,000 people work each day.

MAX FRANK worked closely with the Byrne Bros. site team and with the Structural Engineers throughout the project to ensure a successful conclusion. Shear links had already been designed for this project so MAX FRANK's technical design engineer's easily converted and successfully replaced shear links with Shearail® to comply with the original design.

Numerous independent tests have demonstrated the stud heads form positive end anchorage flush with the top layer of tension reinforcement. Whereas the anchorage of the links is based mainly on bond, the improved end anchorage of the stud controls the shear cracks and enhances the aggregate interlock.

Extensive material research was undertaken during the design process and product selection of this project, to maximise the recycled content of the building and reduce carbon emissions.

Bouwwerktype:

Kantoorgebouw

Architect:

Make Architects

Gespecialiseerde planners:

Buro Happold

Bouwonderneming:

Mace, Byrne Bros (Formwork)

Voltooiing:

2016


Gebruikte producten
Contact Contact

+31 162 241 051

Max Frank Nederland B.V.
Ramgatseweg 9a
4941 VN Raamsdonksveer
Nederland

blub