Norge: norskNorge: norsk
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutsch
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Edging For Floor Slab/Wall With Coated Metal Waterstop

The secondary reinforced construction joint formwork element with its double-sided formwork element serves for the formation of an upstand for the wall/slab. The formwork element comprises a coated metal water stop for watertight joints. The special coating guarantees improved bonding between the concrete and the metal water stop. Installation takes place on the upper reinforcement layer of the slab, between the starter bars of the wall.

Eiendommer

  • Suitable for water-impermeable concrete
    Suitable for water-impermeable concrete
Max Frank anbefaler
Contact Contact
Contact

+47 37 41 84 20

Max Frank AS
Lienga 6
1414 Trollåsen
Norge

blub