Norge: norskNorge: norsk
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

How to: Concreting and providing thermal insulation to circular columns in one simple step

Tubbox® column formwork with insulation, © www.maxfrank.com
Tubbox® column formwork with insulation, © www.maxfrank.com
To insulate external columns, the insulation is often applied after concreting. This is difficult due to the geometrical form of the columns. With a special Tubbox® column formers, the insulation is already integrated during manufacture. The polystyrene insulation forms an optimal bond to the hardened concrete due to its shape.

How to:

    • Place the concrete reinforcements against the column and connect to the starter bars.
    • Mount the spacers. Using the round MAX FRANK spacer “Rondo” will make the following mounting of the formwork easier.
    • Place the formwork with integrated polystyrene insulation over the reinforcement.
    • Align the circular column vertically and fix with push-pull props.
    • Concretethe column.
    • After removing the formwork the insulation will remain fixed to the column.
    • This can be treated according to the thermal insulation composite system used.

2021

SERVICE BOX
Vi anbefaler
Contact Contact
Contact

+47 37 41 84 20

Max Frank AS
Lienga 6
1414 Trollåsen
Norge

blub