To insulate external columns, the insulation is often applied after concreting. This is difficult due to the geometrical form of the columns. With a special Tubbox® column formers, the insulation is already integrated during manufacture. The polystyrene insulation forms an optimal bond to the hardened concrete due to its shape.
How to:
Place the concrete reinforcements against the column and connect to the starter bars.
Mount the spacers. Using the round MAX FRANK spacer “Rondo” will make the following mounting of the formwork easier.
Place the formwork with integrated polystyrene insulation over the reinforcement.
Align the circular column vertically and fix with push-pull props.
Concretethe column.
After removing the formwork the insulation will remain fixed to the column.
This can be treated according to the thermal insulation composite system used.
Tubbox® Søyleform-serien gir muligheter til å skape form etter behov. Det er tre alternativer på de enkle runde formene Spiral, Glatt og Zemdrain®. Det finnes også et bredt spekter av geometriske former, som firkantede, rektangulære, ovale eller teksturerte.
ProduktTubbox® søyleformer
At a filling station in Bratislava Tubbox® column formers, type "spiral“ were used for the formwork of the concrete circular columns.
ProsjektKORZO shopping centre filling station Bratislava
In September 2011 a new shopping center with an area of 43,000 m² was opened in Szczecin.
ProsjektShopping mall KASKADA Szczecin
The "Palais an der Oper", the former Residenzpost on Munich's Maximilianstraße, has been renovated and rebuilt as an exclusive residential and commercial building.