Norge: norskNorge: norsk
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Gustav-Heinemann Quarter

Köln, Germany

Complex reinforcement work in the area of expansion joints was avoided by use of the Egcodorn® shear force dowel in the Gustav-Heinemann Quarter.

After relocation of the BDI to Berlin in 1999, the office building from the 70s was renovated. Nevertheless, the building lost its appeal and many companies followed the trend to move offices to the city centre. The new owner from Munich therefore decided to change the whole look of the building with an attractive new shell. The aim was to create a high-quality residential area in the immediate vicinity of the Rhine with up to 130 private apartments and a gross floor area of 18,500 sqm.

Approx. 1,000 Egcodorn® WQ shear force dowels were installed in the new building. The use of the Egcodorn® shear force dowel avoids complex formwork and reinforcement work in the area of expansion joints. The unique corrosion protection system and the use of high quality materials guarantee maximum durability. The thermal separation of the balconies was achieved with around 800 Egcobox® cantilever connectors, which were optimally adapted to the building situation. These connectors reliably prevent thermal bridges.

Type bygning:

Wohngebäude

Ingeniører/spesialistplanleggere:

Tragswerksplaner: Kempen Krause Ingenieure, Düsseldorf
www.kempenkrause.de

Byggentreprenør:

BAM Deutschland AG, Stuttgart
www.bam-deutschland.de

Distributør:

P. Hahn GmbH & Co.KG, Frechen
www.hahn-schalung.eu

Fullføring:

2014

Produkter som brukes
Contact Contact
Contact

+47 37 41 84 20

Max Frank AS
Lienga 6
1414 Trollåsen
Norge

blub