Norge: norskNorge: norsk
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

Station Łódź Fabryczna

Łódź, Poland

In December 2011 the construction of the multi-storey railway station "Łódź Fabryczna" in Poland started.

After the spectacular "Sky Tower Project" in Wrocław, MAX FRANK Poland focused on a new project launched in December 2011, the head station "Łódź Fabryczna".

The construction of the multi-storey railway station is one of the largest in Poland. About 750,000 m³ of concrete were used, three times more than for the complete project of the National Stadium in Warsaw. The building has three underground floors, the lowest (16.5 m underground) has four 400 m long tracks. A level above there is the station hall with shops, waiting rooms, ticket counters, etc., as well as a bus station and a parking garage. Above ground three buildings with more than 10,000 glass plates cover a total area of ​​36,000 m².

For the floor slabs with a thickness 1.6 m-2.4 m and the walls formwork elements for controlled crack joints Stremaform® with rubber water bar cage were used. The slabs of the underground station concourse were equipped with 1,300 shear force dowel Egcodorn® and 3,000 shear force dowel Egcodübel. After many delays, the station was finally opened in autumn 2016.

Type bygning:

Bahnhof

Byggentreprenør:

Torpol, Intercor, Astaldi, Przedsiębiorstwo Budowy Dróg i Mostów

Fullføring:

2016 