Tracks for trams are subject to lower loads in comparison with railway tracks. Therefore strip foundations are generally adequate, even on sandy ground.
If the fixing anchors have already been cast into the foundations, the rail height can be coarsely levelled - even before concreting.
Septembrie 2018
+40 722 721723
Max Frank S.R.L.
Av. Traian Vasile 74
012082 Bucharest
Romania