Office building in a new, exclusive quarter with a high quality of ambience.
ProjectGreat Eastern Quay London
Great Eastern Quays is a mixed-use masterplan for a 6.2ha site and forms part of the Royal Albert Basin area at the eastern end of the Royal Docks complex.
ProjectVodafone campus Düsseldorf
The Vodafone campus includes a 19-story office tower, three building blocks and a parking garage. Bar spacers made of cast concrete were supplied for this purpose.
ProjectSmart Campus Wien
Smart Campus is the new headquarters of Wiener Netze GmbH. The Egcodorn® shear force dowel was used in the expansion joints.
ProjectSAB - Sächsische AufbauBank Leipzig
Due to the high groundwater contamination, a sealing concept with FBV system was planned as an additional measure.
ProjectState Office of Finance Landshut
The Egcobox® thermally insulating cantilever connector was used in the creation of a projecting solar protection structure at the State Office of Finance.