Effective reinforcement of concrete manhole chamber rings is achieved by encasing them in concrete. The flexible Pecafil® formwork material is an ideal solution.
In order to protect overbuilt existing structures such as tunnels or channels from the load of a new building situated above, a load-free separation layer can be created between the existing structure and the new building using the Egcovoid® void former.
The MAX FRANK permanent formwork Pecafil® can be used for foundation formwork, where it also proves advantageous in combination with prefabricated reinforcement cages.
In urban areas, the supply & positioning of media ducts in road construction is becoming increasingly important. The universal formwork material Pecafil® in U-shape is particularly suitable as formwork for concreting due to its quick and easy installation.
When sealing the surface of bored concrete piles, a flat surface is required, which can be achieved with the installation of the Pecafil® permanent formwork.
In larger building projects, crane foundations are integrated directly into the floor slab and are the first areas to be concreted. Stremaform® is useful to get connected and sealed this construction situation.
Tracks for trams are subject to lower loads in comparison with railway tracks. Therefore strip foundations are generally adequate, even on sandy ground.