United Kingdom: englishUnited Kingdom: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

How to: Crane foundation in concrete floor slab

 © www.maxfrank.com
© www.maxfrank.com

In larger building projects, crane foundations are integrated directly into the floor slab and are the first areas to be concreted. This stage is extremely important for the construction, because the crane plays an instrumental role on the building site. Stremaform® concrete jointing formwork enables the working joints in the crane foundation to be created quickly, securely and with a force-locked connection. As standard, the Stremaform® working joint can also be prefabricated with integrated waterproofing materials and sealed against groundwater

How to:

  • Lay the lower reinforcement on suitable spacers with a predetermined overlap length relative to the floor slab.
  • Place Stremaform® spacers (fibre concrete rails with integrated expanded metal strips) in the edge area under the Stremaform® units. This minimises leakage of the concrete slurry in the area of the concrete cover and reinforcement during concreting.
  • Position the prefabricated Stremaform® sections and tie them with wire to the adjacent units and the lower reinforcement layer.
  • Lay the upper reinforcement layer with overlength according to the necessary overlap length.
  • Lay a wooden strip over the elements with a thickness corresponding to the top-side concrete cover.
  • Concrete the crane foundations.
  • Erect the crane with suitable anchoring to the crane foundation. The further floor slabs can now be prepared and concreted with the use of the crane.


March 2020

Service
We recommend
Contact Contact
Contact
Contact us
Contact us

+44 1782 598 041

Place
Place

Max Frank Ltd.
Clough Street, Hanley
Stoke-on-Trent, ST1 4AF
Staffordshire
United Kingdom

blub