United Kingdom: englishUnited Kingdom: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italianodeutsch
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

New building industrial hall

Niederaichbach, Germany

An industrial hall for a German automobile manufacturer is being built near Landshut. This project included the use of the 32 mm diameter Coupler position connection.

A press pit is to be created in the already completed hall. In order to retain the groundwater of the nearby Isar, which is only about one meter below ground level, the excavation pit was first constructed with bored piles and a foundation was laid. Once the dewatering was secured, work could begin on the actual project, the creation of the press pit. This involved particular requirements for planning, reinforcement layout, production and assembly.

Since the ring anchor would be very low due to the already specified height of the floor slab, the structural engineers designed reinforcement bar (8 pieces ø 32 mm) which could be laid in one layer without overlap joints. When using sleeve connections, sleeve joints should be staggered. Due to the very high tensile forces on the ring anchor (dimension approx. 12 m x 18 m), a closed reinforcement system was required with national technical approval for 100% transmission of tensile and compressive forces. The designers therefore chose the new MAX FRANK Coupler position connection, which fulfils these requirements.

The detail planning, the reinforcement bar bending shapes required for the ring anchor and precision manufacture by MAX FRANK combined to convince the planner and client of the Coupler position connection. The building site was supplied to the complete satisfaction of the customer with MAX FRANK sometimes in attendance at the construction.

Type of building:

Industrial hall

Clients and Developers:

Automobilhersteller

Completion:

2016

Products used
Contact Contact
Contact
Contact us
Contact us

+44 1782 598 041

Place
Place

Max Frank Ltd.
Clough Street, Hanley
Stoke-on-Trent, ST1 4AF
Staffordshire
United Kingdom

blub