MAX FRANK Spain supplied the Egcobox® thermal break balcony connector for the project.
The use of the cantilever slab connection contributes to the energy efficiency of the building. Thermal bridges are reduced - thereby reducing condensation and the associated mould formation. Rock wool and 80 mm insulation thickness were chosen for the insulation material. The component complies with fire resistance class R120.
Hospital
Krankenhausgruppe Quirón
www.quironsalud.es/
Pablo García Morales
Francisco Ortega Montoliu
Jorge Sánchez Iglesias
Sacyr www.sacyr.com
2018
+44 1782 598 041
Max Frank Ltd.
Clough Street, Hanley
Stoke-on-Trent, ST1 4AF
Staffordshire
United Kingdom