United Kingdom: englishUnited Kingdom: english
International: english
International: englishInternational: english
Australia: english
Australia: englishAustralia: english
Austria: deutsch
Austria: deutschAustria: deutsch
Canada: english
Canada: englishCanada: english
Czechia: český
Czechia: českýCzechia: český
Denmark: dansk
Denmark: danskDenmark: dansk
Finland: suomi
Finland: suomiFinland: suomi
France: français
France: françaisFrance: français
Germany: deutsch
Germany: deutschGermany: deutsch
Hungary: magyar
Hungary: magyarHungary: magyar
Italy: italiano
Italy: italianoItaly: italiano
Netherlands: nederlands
Netherlands: nederlandsNetherlands: nederlands
Norge: norsk
Norge: norskNorge: norsk
Poland: polski
Poland: polskiPoland: polski
Romania: românesc
Romania: românescRomania: românesc
Slovakia: slovenčina
Slovakia: slovenčinaSlovakia: slovenčina
Spain: español
Spain: españolSpain: español
Sweden: svenska
Sweden: svenskaSweden: svenska
Switzerland: deutsch
Switzerland: deutschSwitzerland: deutschfrançais
UAE: english
UAE: englishUAE: english
United Kingdom: english
United Kingdom: englishUnited Kingdom: english
USA: english
USA: englishUSA: english

St Hedwig Cathedral

Berlin, Germany

The circular formwork of the St. Hedwig Cathedral in Berlin was constructed using Pecafil® permanent formwork.

The former rectory of Sankt Hedwig and residence of the Berlin bishops was closed in 2019 when the renovation and redesign of the cathedral began. In future, it will also serve as the residence and official residence of the Berlin bishops again. As a central measure, the altar will move to the centre, directly under the dome. The conversion work on the Berlin Cathedral is expected to continue until spring 2024.

The time and costs savings achieved by using the formwork material Pecafil® is favourable for the renovation of the cathedral in Berlin. The light weight, easy handling and short assembly time of the curved Pecafil® formwork are particularly advantageous when refurbishing existing structures.

The workers on the Berlin construction site used the formwork material from MAX FRANK for the first time and were impressed by the effortless assembly.

Please accept external cookies to watch this video.

Architect:

Max Dudler www.maxdudler.de

Completion:

2024

Project link:


Products used
Contact Contact
Contact us

+44 1782 598 041

Place

Max Frank Ltd.
Clough Street, Hanley
Stoke-on-Trent, ST1 4AF
Staffordshire
United Kingdom

blub