36 residential units and an underground car park, with 54 parking spaces, are being constructed as part of a new residential development in Tulln. Pecafil® is applied as a separation layer against bored piles.
The universal formwork material Pecafil® VR10 is used as a separating layer between the excavation shoring and the later adjacent outer building wall. Pecafil® also withstands high concreting pressure and serves as a separating and sliding layer to simplify subsequent pulling of the sheet piles. Installation by welding is carried out directly on the sheet pile wall.
The advantages of Pecafil® in excavation shoring are:
Residential building
Leyrer + Graf, Gmünd
www.leyrer-graf.at
2023
+44 1782 598 041
Max Frank Ltd.
Clough Street, Hanley
Stoke-on-Trent, ST1 4AF
Staffordshire
United Kingdom