With the Egcovoid® former, you can reach a planned load-handling after the concreting.
To protect subterranean concrete structures against unintended loads, a flatly load-free layer must be created. This prevents unintended load, by deflections due to dynamic traffic loads (heavy vehicles, trucks, etc.). With the Egcovoid® former, you can reach a planned load-handling after the concreting.
How to:
+44 1782 598 041
Max Frank Ltd.
Clough Street, Hanley
Stoke-on-Trent, ST1 4AF
Staffordshire
United Kingdom